- A smart temporary structure used for climbing and working at heights is Wedgelock Scaffolding. When compared to the traditional scaffold structure, this one which is made by implementing wedge fixing technique, is absolutely simple to erect and fix. It is considered extensively safe due to having no loose parts and having wedge fixed transoms & ledgers. The scaffold structure provides stable position due to being rigid and having 4 ways fixing between the ledgers and transoms. Further, to make sure a perfect vertical alignment, standard structure of the offered Wedgelock Scaffolding is erected with durable wedge fitting and spigots.
Salient Features:- Having wedge fixing of transoms & ledgers that allow fast erecting of scaffolding, eliminating need of loosing parts
- The four way fixing system of the structure provide positive location without movement
- Comes with tubes that allow in connecting the hook to have the safe base
- Adjustable, hence it is possible to make the structure of any height and width
Showing 11 ItemsAluminium Formwork Beam
Delivery Time: 1 MonthsSupply Ability: 300 Per MonthSurface Treatment: Corrosion resistantMain Material: AluminiumUsage: For ConstructionsThickness: 18 Millimeter (mm)Length: 6 Millimeter (mm)Application: Industrial, CommercialHeight: 50 Millimeter (mm)Price: 6500 INR/Square Meter H Beam Wall Formwork System
Platform Loading Capacity: 6.25 Metric TonLength: 5.0 Centimeter (cm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Delivery Time: 1 MonthsSupply Ability: 300 Per MonthPrice: 6500 INR/Square MeterH Beam Curved Wall Formwork
Platform Loading Capacity: 6.25 Metric TonLength: 2.25 Millimeter (mm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Delivery Time: 1 MonthsSupply Ability: 300 Per MonthPrice: 6500 INR/Square MeterH Beam Column Formwork
Length: 6.0 Meter (m)Width: 6 -10 Foot (ft)Height: 50 Centimeter (cm)Thickness: 18 Square FeetDiameter: 2.50 Meter (m)Platform Loading Capacity: 6.25 Metric TonDelivery Time: 1 MonthsSupply Ability: 300 Per MonthPrice: 6500 INR/Square MeterCustom Formwork
Delivery Time: 1 MonthsSupply Ability: 300 Per MonthLength: 2.25 Millimeter (mm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Platform Loading Capacity: 6.25 Metric TonPrice: 6500 INR/Square MeterH20 beam formwork for Building Constructions
Supply Ability: 300 Per MonthDelivery Time: 1 MonthsPrice: 6500 INR/Square MeterClimbing Formwork
Delivery Time: 1 MonthsSupply Ability: 300 Per MonthPlatform Loading Capacity: 6.25 Metric TonThickness: 18 Millimeter (mm)Height: 50 Millimeter (mm)Length: 6.0 Millimeter (mm)Price: 6500 INR/Square MeterH16 / H20 Formwork Beams
Delivery Time: 1 MonthsSupply Ability: 300 Per MonthMaterial: AluminumPlatform Loading Capacity: 6.25 Metric TonLength: 2.5 Millimeter (mm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Price: 6500 INR/Square MeterTable Formwork
Supply Ability: 300 Per MonthDelivery Time: 1 MonthsHeight: 50 Centimeter (cm)Width: 6 -10 Foot (ft)Length: 6.0 Meter (m)Thickness: 18 Millimeter (mm)Diameter: 2.50 Meter (m)Platform Loading Capacity: 6.25 Metric TonPrice: 6500 INR/Square MeterClimbing Formwork System
Length: 1.2 Millimeter (mm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Platform Loading Capacity: 6.25 Metric TonDelivery Time: 1 MonthsSupply Ability: 300 Per MonthPrice: 6500 INR/Square MeterSlab Formwork System
Supply Ability: 300 Per MonthDelivery Time: 1 MonthsLength: 2.25 Millimeter (mm)Height: 600 Millimeter (mm)Thickness: 2 Millimeter (mm)Material: AluminumPlatform Loading Capacity: 6.25 Metric TonPrice: 6500 INR/Square Meter
Contact Us